Classrooms that stay awake. Air that gets changed. Boilers ready in October.
Schools have a hard calendar: no major work in June exams, no dead boilers in January, and gyms that go from empty to packed. We maintain and replace classroom units, rooftop equipment, boilers, and gym systems on that calendar.
Why this building type is its own job
Classrooms
Unit ventilators and rooftop zones that haven't seen a real filter schedule.
Stuffy rooms and CO2 complaints by second period.
Gyms
Huge volume, intermittent occupancy, tired destratification.
Cold mornings for class, overheated evenings for games.
Portables
Heat pumps and wall units doing a job they were barely sized for.
The portable is the room everyone complains about.
Plant
Ageing boilers and pumps with one path of failure.
A single pump trip takes the wing down.
Turnkey support
Ventilation first
- Outdoor air and filtration checked against how the room is used
- Filter programs on a schedule the caretaker can keep
- Unit ventilator and rooftop repairs
Heating plant
- Boiler and pump service before heating season
- Replacement plans that can run over a summer
- Freeze protection that is actually tested
Summer work window
- Replacements booked for the break, not the first week of class
- Phased wings so part of the building can stay in use
- Start-up before staff return
What you get from us
We know the school calendar
Heavy work lands in the break. Emergency work still happens in term.
Caretaker-friendly reports
Short notes: what we did, what's next, what to watch.
Portables through the plant
One contractor for the small units and the boiler room.
Typical package for a school
- Classroom unit ventilator or rooftop service
- Gym air handler and exhaust
- Boiler and hydronic pump maintenance
- Portable heat pump service
- Filter program on the school year
- Summer capital replacements with fall start-up
Looking for the broader service list? See commercial HVAC or industrial HVAC.